I have a two projects. One is freshly setup project on Azure DevOps using the SCRUM methodology while the other is Legacy conversion to SCRUM. I'm trying to move a singe Product Backlog from one project to the other to no avail, though ironically I can move tasks with no issues.
I've set up the Product Backlogs identically on both projects, from layouts and States all the way down to the same image and same color.
Is this a design feature, or am I missing something?
Product Backlog Layout
与恶龙缠斗过久,自身亦成为恶龙;凝视深渊过久,深渊将回以凝视…